A measured survey of a typical single-story house takes one to two hours on site. Additions, split levels and basements each need their own reference. A house with several takes longer in proportion.
What a St. Louis survey is reading against
The readings matter here because the ground does. The largest soil mapped here is hydrologic group C, and the slowest of the largest mapped soils takes water in at 1.28 inches an hour. How fast water leaves the ground decides how much the soil beside a foundation changes through the year, and a single set of readings is a snapshot of one season — which is the argument for keeping the report rather than filing it.
The reasoning behind that
The time on site is mostly the readings. Elevations are taken at points across every floor plane, and a simple rectangular house over one basement is one plane. Every addition, every step down into a sunken room and every section over a crawl space is another. Each needs its own reference before the readings mean anything. Basement walls are read on their own, for bow and lean. Access is the other variable. Furniture, flooring, finished walls and stored belongings all hide the points a reading needs. A crawl space that cannot be entered is a section that cannot be assessed. Clearing access before the appointment shortens it materially. Time on site is not the same as turnaround. The report usually arrives afterwards: the readings, where each was taken, and the date. If a contract deadline is running, ask about that turnaround, not the length of the visit. If nothing arrives in writing at all, the visit produced an opinion, not a measurement. An opinion cannot be compared against a second reading next year.
Every question, in one place: St. Louis Foundation Repair Co questions.
Check the St. Louis Foundation Repair Co service area to see whether your street is covered.
Back to St. Louis Foundation Repair Co.